Project Description: |
MILTON- RECONSTRUCTION ON GRANITE AVENUE, FROM NEPONSET RIVER TO SQUANTUM STREET (5,000 FEET)
Work consists of reconstructing Granite Avenue for the support of the Central Maintenance Facility and Highway Operations Center relocation and construction. See #608405. The limits are from the Southeast Expressway ramps near the Neponset River extending southerly to Squantum Street. 2 - 12 foot travel lanes, a 5 foot bicycle lane, and 5 foot sidewalk on both sides are proposed.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Project Manager: | Gautam Sen |
Estimated Total Contract Cost: | $3,665,146.26 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 6 |
Current Status: | 25% Package Received (as of 02/10/2017 ) |
|