Project Description: |
SANDWICH- CONSTRUCTION OF SHARED USE PATH ALONG SERVICE ROAD FROM ROUTE 130 TO CHASE ROAD
In 2013, National Grid (NGRID, an international electricity and gas company, approached the Town of Sandwich with a request to construct and maintain a 20” gas main in the roadside area between the Service Road pavement and the Mid-Cape Highway right-of-way.
The Town of Sandwich, as part of the local permit process, mandated that a variety of public betterments be included in the project. One such betterment requires National Grid to include tree removal and rough grading along the proposed gas line alignment that would serve as a base for constructing this first phase of a multi-phase shared-use path project from Route 130 to Chase Road.
|
Location: |
|
Construction Begins: | Autumn 2022 |
Resident Engineer: | Michelle Muller |
Construction Bid Price: | $8,932,505.20 |
District: | District 5 |
Current Status: | The contractor is on site installing drainage structures and grading slopes along Service Road. Sedimentation removal and slope repairs will be performed adjacent to Route 6 EB on Friday, April 5th, at Mile Marker 61. Paving operations along the Shared Use path are scheduled for April 8-10. Fence and Wood Rail installations are in progress, as well as aerial utility work by third party utility companies. Intermittent single lane closures with alternating traffic along Service Road is anticipated while Shared Use Path paving operations are taking place. Normal work hours are Monday through Friday, 7:00 Am to 3:30 PM. Expect periodic lane closures and restrictions. (as of 04/02/2024) |
|
Bridges |
|
|
|
|