| Project Description: |
DISTRICT 3- HOT MIX ASPHALT AND BERM REPAIR AT VARIOUS LOCATIONS
The Contract is for the repair of hot mix asphalt on State Highways in District 3.
|
| Location: | |
| Construction Begins: | Spring 2017 |
| Resident Engineer: | Raymond Tannar![]() |
| Construction Bid Price: | $1,057,976.73 |
| District: | District 3 |
|
Bridges |
||||||||
|
||||||||||
|
|
|
|||||||||||||||||||||||||||||