| Project Description: |
DISTRICT 5- DRAWBRIDGE OPERATION, REPAIR & SYSTEMATIC PRESERVATION AT VARIOUS LOCATIONS
This contract is for Scheduled & Emergency Drawbridge Repairs for our movable bridge inventory in District 5.
|
| Location: | |
| Construction Begins: | Spring 2017 |
| Resident Engineer: | Louis daPonte![]() |
| Construction Bid Price: | $3,478,630.00 |
| District: | District 5 |
|
Bridges |
||||||||
|
||||||||||
|
|
|
|||||||||||||||||||||||||||||