Project Description: |
DISTRICT 5- TRAFFIC SIGNAL MASTER CONTROL AND CABINET ASSEMBLY INSTALLATION AT VARIOUS LOCATIONS
WORK SHALL INCLUDE UPGRADES ANDINSTALLATIONS OF TRAFFIC SIGNAL MASTER CONTROL AT VARIOUS LOCATIONS
|
Location: | |
Construction Begins: | Winter 2017/2018 |
Resident Engineer: | April Letourneau |
Construction Bid Price: | $495,317.00 |
District: | District 5 |
|
Bridges |
|
|
|
|