| Project Description: |
DISTRICT 5- TRAFFIC SIGNAL MASTER CONTROL AND CABINET ASSEMBLY INSTALLATION AT VARIOUS LOCATIONS
WORK SHALL INCLUDE UPGRADES ANDINSTALLATIONS OF TRAFFIC SIGNAL MASTER CONTROL AT VARIOUS LOCATIONS
|
| Location: | |
| Construction Begins: | Winter 2017/2018 |
| Resident Engineer: | April Letourneau![]() |
| Construction Bid Price: | $495,317.00 |
| District: | District 5 |
|
Bridges |
||||||||
|
||||||||||
|
|
|
||||||||||||||||||||||||||||||||||||||