Project Description: |
BOSTON- REVERE- GUIDE AND TRAFFIC SIGN REPLACEMENT ON ROUTE 1A
Project consists of the replacement and upgrading of guide and traffic signs and structures on Route 1A, inclduing intersecting secondary roadways where applicable, between Bell Circle in Revere and the Sumner and Ted WIlliams Tunnels in Boston.
|
Location: |
|
Construction Begins: | Winter 2017/2018 |
Resident Engineer: | Jeovanny Rodriguez |
Construction Bid Price: | $1,151,072.42 |
District: | District 6 |
|
Bridges |
|
|
|
|