LANCASTER- HARVARD- LITTLETON- RESURFACING AND RELATED WORK ON ROUTE 2
Work consists of resurfacing on Route 2.
Location:
  • Town of Harvard
  • Town of Lancaster
  • Town of Littleton
  • Design Responsibility: In-House Boston
    Right of Way Responsibility: MassDOT
    Project Manager: Valerie E Kilduff
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 3
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

    • H09009 
    • H09010 
    • H09011 
    • H09012 
    • H09013 
    • H09014 
    • H09015 
    • H09016 
    • H09017 
    • H09018 
    • L02015 
    • L02016 
    • L02018 
    • L13015 
    • L13016 
    • L13017 
    • L13018 
    • L13022 
    See the Milestone Details tab for additional Project information