| Project Description: |
AVON- STOUGHTON- RESURFACING AND RELATED WORK ON ROUTE 24
Work consists of resurfacing on Route 24.
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Violet Wilkins![]() |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 5 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
||||||
|
|
|
||