| Project Description: |
MARLBOROUGH- BRIDGE PRESERVATION, M-06-009, US 20 (OLD BOSTON ROAD) OVER I-495 (NB & SB)
The scope of work includes milling the wearing surface, repairing the concrete bridge deck, replacing and reconfiguring the joints, install new waterproofing membrane and re-paving. It will also include repairs to the substructure and other miscellaneous preservation work.
|
| Location: |
|
| Construction Begins: | Spring 2017 |
| Resident Engineer: | Nicholas Heath![]() |
| Construction Bid Price: | $2,689,922.00 |
| District: | District 3 |
|