Project Description: |
WINCHENDON- RESURFACING & RELATED WORK ON ROUTE 140, FROM TEEL ROAD TO 430 FT. SOUTH OF ROUTE 12 (1.1 MILES)
This project will begin at Teel Road and extend northerly to 430 ft. south of Route 12 for a total project length of 1.1 miles. As part of this project the roadway will be milled and overlaid. Also included in this project will be the installation of rumble strips, slotted pavement markers, drainage improvements and new signage.
|
Location: |
|
Construction Begins: | Winter 2016/2017 |
Resident Engineer: | Matthew Fuller |
Construction Bid Price: | $544,859.84 |
District: | District 2 |
|
Bridges |
|
|
|
|