| Project Description: |
DISTRICT 4- FABRICATION AND INSTALLATION OF OVERHEAD AND GROUND MOUNTED GUIDE SIGNS AT VARIOUS LOCATIONS
FABRICATION AND INSTALLATION OF OVERHEAD AND GROUND MOUNTED GUIDE SIGNS AT VARIOUS LOCATIONS
|
| Location: | |
| Construction Begins: | Spring 2017 |
| Resident Engineer: | Eric Zilinsky![]() |
| Construction Bid Price: | $639,383.75 |
| District: | District 4 |
|
Bridges |
||||||||
|
||||||||||
|
|
|
||||||||||||||||||||||||||||||||