Project Description: |
UXBRIDGE TO WORCESTER- GUIDE AND TRAFFIC SIGN REPLACEMENT ON A SECTION OF ROUTE 146
Project is to replace and update guide and traffic signs along Route 140 and intersecting roadways between the Rhode Island/Massachusetts border in Uxbridge and I-290 in Worcester.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Project Manager: | Stephen Timmins |
Estimated Total Contract Cost: | $1,047,000.00 |
Estimated Total Federal Participating Construction Cost: | $1,123,500.00 |
District: | District 3 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges |
|
|
|