| Project Description: |
BURLINGTON TO TYNGSBOROUGH- GUIDE AND TRAFFIC SIGN REPLACEMENT ON A SECTION OF US 3
This project is for the updating and replacement of guide and traffic signs on US Route 3 and intersecting roadways from I-95 (MA 128) in Burlington to the Massachusetts/New Hampshire border in Tyngsborough.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Stephen Timmins![]() |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 4 |
| Current Status: | This project is in the preliminary design phase. |
|