BURLINGTON TO TYNGSBOROUGH- GUIDE AND TRAFFIC SIGN REPLACEMENT ON A SECTION OF US 3
This project is for the updating and replacement of guide and traffic signs on US Route 3 and intersecting roadways from I-95 (MA 128) in Burlington to the Massachusetts/New Hampshire border in Tyngsborough.
Location:
  • Town of Billerica
  • Town of Burlington
  • Town of Chelmsford
  • Town of Tyngsborough
  • Town of Westford
  • Construction Begins: Winter 2020/2021
    Resident Engineer: Youssef Aboelsaad
    Construction Bid Price: $6,889,243.30
    District: District 4
    Current Status: The Contractor, RoadSafe (formerly Liddell Bros.) is continuing pouring the Overhead signs foundations on Rte. 3 NB and Rte. 3 SB. They also began the installation of the Ground Mount Signs. They started installing the Overhead Sign Support Structures and Sign Panels during nightshift operations. (as of 01/23/2024)
    Additional Info: The Contractor, RoadSafe (formerly Liddell Bros.) is planning to continue pouring the foundations of the Overhead signs supports. They are also planning to continue the installing the Overhead and ground mount Sign. Work will be during the day shift and night shift. (as of 01/23/2024)

    Contracts (1) Progress
    # 113643 -- Construction Contract
    Fabrication, Installation and Removal of Overhead and Ground Mounted Guide and Traffic Signs along a Section of Route 3 64% Complete

    Bridges

  • - none -
  • Contract Dates
    Notice to Proceed: 03/01/2021
    Contract Information
    Project Designer: Consultant
    Funding Source: NATIONAL HIGHWAY SYSTEM
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 05/12/2016
    Project Initiation Form PIF Entered 05/12/2016
    Project Initiation Form PRC Submitted 10/03/2016
    Project Review Committee PRC Approved 10/06/2016
    Project Status Advertised 12/12/2020
    Project Management
    100% Design 100% Package Received 08/10/2020
    100% Design 100% Package Comments to DE 09/21/2020
    25% Design 25% Package Received 10/22/2019
    25% Design 25% Package Comments to DE 02/05/2020
    25% Design 25% Package Approved 01/29/2020
    75% Design 75% Package Received 08/10/2020
    Final Design PS&E Received 11/09/2020
    Final Design PS&E to FAPRO 11/30/2020