| Project Description: |
CHICOPEE TO HOLYOKE- GUIDE AND TRAFFIC SIGN REPLACEMENT ON I-391
This project will update and replace the guide and traffic signs on I-391 and intersecting roadways from the I-91 interchange in Chicopee to the High Street interchange in Holyoke.
|
| Location: |
|
| Project Manager: | Stephen Timmins![]() |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 2 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges |
||||||
|
|
|
||