Project Description: |
DISTRICT 5- SYSTEMATIC BRIDGE PRESERVATION ALONG THE I-195 CORRIDOR
This project is to perform painting of the bridges on the I-195 corridor.
|
Location: | |
Construction Begins: | Winter 2020/2021 |
Resident Engineer: | Rajat Gogoi |
Construction Bid Price: | $1,188,192.50 |
District: | District 5 |
|
Bridges
|
|
|
|
|