Project Description:
|
ATHOL- BRIDGE REPLACEMENT, A-15-008, CRESCENT STREET OVER MILLERS RIVER
The work to be done at the Crescent Street Bridge under this Contract involves the replacement of the existing bridge structure carrying Crescent Street over Millers River at the same location and the reconstruction of a portion of each approach. The existing single-span bridge will be replaced with a new single-span bridge of the same span length. Work also includes full depth pavement reconstruction in both approaches, drainage improvements, sidewalk reconstruction, and utility installations and relocations.
|