| Project Description: |
LUNENBURG- BRIDGE REHABILITATION, L-17-009, ROUTE 2A OVER PEARL HILL BROOK
The bridge rehabilitation will consist of two construction stages to replace the existing hybrid superstructure with a new precast concrete deck and HMA overlay. There will also be safety upgrades consisting of new parapets/endposts/guardrail. A cantilevered support for sidewalk/utilities may also be required.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Kathy Dougherty![]() |
| Estimated Total Federal Participating Construction Cost: | $1,755,772.19 |
| District: | District 3 |
| Current Status: | This project has been advertised for construction bids. (as of 12/05/2020 ) |
|
Bridges
|
||||||||||||||||||||||||||
|
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||