| Project Description: |
AMESBURY- HAVERHILL- MERRIMAC- SALISBURY REFLECTIVITY UPGRADES ON I-495
The work shall consist of the installation of reflectorized pavement markers into existing milled slots, reflectorized flexible delineator posts, demountable reflectorized delineators for guardrail, delineation for guardrail termini, and incidental items of work as required by the Engineer.
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Charles Hale Jr![]() |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 4 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges |
||||||
|
|
|
||