Project Description: |
DISTRICT 6- ROADSIDE BARRIER RECONSTRUCTION & REPAIR AT VARIOUS LOCATIONS
Roadside barrier reconstruction and repair throughout D6.
|
Location: | |
Design Responsibility: | In-House Boston |
Right of Way Responsibility: | MassDOT |
Project Manager: | Ancarlos M Youssef |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 6 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges |
|
|
|