| Project Description: |
HOLDEN- WEARING SURFACE PRESERVATION AND RELATED REPAIRS TO H-18-027, MALDEN STREET OVER I-190 (NB AND SB)
The work on the subject bridge will consist of removing (hydro demolition) the existing wearing surface, repairing the deck and installing a thin rigid overlay (LMC or Dense concrete) and all related work.
|
| Location: | |
| Construction Begins: | Spring 2018 |
| Resident Engineer: | Wayne Richard![]() |
| Construction Bid Price: | $1,527,601.00 |
| District: | District 3 |
|