Project Description: |
DARTMOUTH- BRIDGE PRESERVATION, D-04-002 (3J4), BRIDGE STREET OVER APPONAGANSETT RIVER
The work under this contract consists of rehabilitation of the substructure of the Padanaram Bridge along Bridge Street in Dartmouth, Massachusetts. The work includes stone masonry wall repairs (submerged and above water) and the repair of concrete caps.
|
Location: |
|
Construction Begins: | Spring 2018 |
Resident Engineer: | Alfredo Nunez |
Construction Bid Price: | $794,040.00 |
District: | District 5 |
|
Bridges
|
|
|
|
|