Enter a City or Road name to search for a new project:
Advanced Project Search
Project Description:
EGREMONT- RECONSTRUCTION AND RELATED WORK ON ROUTE 23/41, FROM CREAMERY ROAD TO NORTH UNDERMOUNTAIN ROAD
This project proposes to reconstruct 0.7 miles of State Highway to create a “complete streets” design template in the village center of Egremont. The existing roadway cross-section consists of two travel lanes with variable width shoulders (2-6 ft). Sections of un-connected sidewalk, on both sides of the roadway, are present on the western half of the project. Crosswalks exist at the South Egremont Post Office and the South Egremont School. The current design concept is to reconstruct the roadway to a consistent 32 ft width (5-11-11-5) for bicycle accommodation; and to provide one continuous sidewalk, probably on the north side of the roadway, with improved crossing opportunities to better accommodate pedestrian movements in the village center. Access management techniques may be explored to consolidate access points and turning movements at abutting properties. Existing horizontal and vertical alignment will be evaluated for AASHTO compliance, and improvements proposed accordingly. Some geometric improvements at intersections may also be required. The drainage system will be evaluated and upgraded to current design standards. There are some roadside embankment areas that require slope stabilization measures; these areas will be evaluated and included in the design as well. MUTCD compliant signs and pavement markings will be proposed, and other amenities may be included in the design to enhance bike/ped accommodation in this area.
Location:
  • Town of Egremont
  • Construction Begins: Summer 2022
    Resident Engineer: David Reynolds
    Construction Bid Price: $7,772,343.90
    District: District 1

    Contracts (3) Progress
    # 115773 -- Design -- Services
    Statewide - Master Service Agreement for design and review services. Final
    # 118722 -- Construction Contract
    Roadway Reconstruction and Related Work (Including Culvert Replacement) on a Section of Route 23/41 (Main Street) 83% Complete
    # 77870 -- Design -- Hwy Eng Open End
    Master Service Agreement for statewide design and review services. Final

    Bridges

  • - none -
  • Contract Dates
    Notice to Proceed: 09/01/2022
    Contract Information
    Project Designer: Consultant
    Funding Source: FED. AID. ACCELERATED BRIDGE
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 01/27/2017
    Project Initiation Form PIF Entered 03/13/2017
    Project Initiation Form PRC Submitted 03/13/2017
    Project Review Committee PRC Approved 03/23/2017
    Project Status Advertised 06/25/2022
    Project Management
    100% Design 100% Package Received 06/04/2021
    25% Design 25% Package Received - Resub 1 02/11/2020
    75% Design 75% Package Received 08/17/2020
    Final Design PS&E Received 12/22/2021
    Final Design PS&E Received - Resub 1 05/19/2022
    Consultant Contract Process NTP Issued 05/30/2018