| Project Description: | STURBRIDGE- CLARK ROAD WATERLINE CONNECTION Project consists of extending ductile iron town water line approx. 800 feet to neighborhood and connecting two residences to town water. | 
| Location: |  | 
| Construction Begins: | Spring 2019 | 
| Resident Engineer: | David Windoloski  | 
| Construction Bid Price: | $231,561.43 | 
| District: | District 3 | 
| 
 | Bridges | ||||||||
| 
 | ||||||||||
| 
 | 
| 
 | 
| 
 
 
 | ||||||||||||||||||||||||||||||||