| Project Description: |
STURBRIDGE- CLARK ROAD WATERLINE CONNECTION
Project consists of extending ductile iron town water line approx. 800 feet to neighborhood and connecting two residences to town water.
|
| Location: |
|
| Construction Begins: | Spring 2019 |
| Resident Engineer: | David Windoloski![]() |
| Construction Bid Price: | $231,561.43 |
| District: | District 3 |
|
Bridges |
||||||||
|
||||||||||
|
|
|
||||||||||||||||||||||||||||||||