Project Description:
AMHERST- HADLEY- NORTHAMPTON- TRANSIT SIGNAL PRIORITY UPGRADES AT VARIOUS LOCATIONS
This purpose of this project is to implement a High Priority Transit Signal Priority (TSP) system along the Pioneer Valley Transit Authority’s heavily utilized B43 route; in addition the project has the potential to improve traffic operations on both state- and municipally-owned roadways within the project limits by prioritizing traffic flow along principal arterial roadways over their intersecting streets. The B43 route connects Amherst town center with UMass Amherst, the Route 9 corridor in Hadley (including the Hadley malls), and downtown Northampton. The B43 has one of the highest ridership volumes in the PVTA transit system and could potentially attract additional ridership if service was improved. The deployment of TSP technology is an effective measure to improve the running time for the B43 with minimal effort. The project will include the evaluation and potential upgrade of signal controllers and appurtenances for up to eleven intersections.
Location:
  • Town of Amherst
  • Town of Hadley
  • City of Northampton
  • Construction Begins: Spring 2019
    Resident Engineer: William Whiteman
    Construction Bid Price: $1,065,423.00
    District: District 2

    Contracts (2) Progress
    # 105925 -- Construction Contract
    Installation of a Transit Signal Priority (TSP) Control and Adaptive Traffic Signal Control Systems at 22 Intersections. Completed
    # 86948 -- Design -- Traffic Signing/Signals
    Work will consist of providing the engineering and technical support necessary to allow the application and implementation of enhanced signal operations, electrical systems an Final

    Bridges

  • - none -
  • Contract Dates
    Notice to Proceed: 04/12/2019
    Contract Information
    Project Designer: Consultant
    Funding Source: FED. AID. ACCELERATED BRIDGE
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 02/22/2017
    Project Initiation Form PIF Entered 02/22/2017
    Project Initiation Form PRC Submitted 02/27/2017
    Project Review Committee PRC Approved 03/23/2017
    Project Status Advertised 09/15/2018
    Project Management
    100% Design 100% Package Received 07/02/2018
    75% Design 75% Package Received 03/09/2018
    75% Design 75% Package Comments to DE 04/18/2018
    75% Design 75% Package Received - Resub 1 05/09/2018
    Final Design PS&E Received 08/29/2018
    Final Design PS&E to FAPRO 08/31/2018