MILLVILLE- UXBRIDGE- PAVEMENT PRESERVATION AND RELATED WORK ON ROUTE 146
This project consists of applying an Ultra Thin Bond Overlay to the travel lanes of Route 146 in the towns of Millville and Uxbridge. The southern limit is at the Rhode Island/Massachusetts state line (mm 0.0±). The northern limit is at a pavement joint just north of Mill Street in Uxbridge (mm 3.7±). The total length of this project is approximately 3.7 miles. The work will primarily consist of removing existing slotted markers, milling pavement shims, crack sealing, placing a 3/4” lift of HMA Surface Course Ultra Thin Bonded Overlay (UTBO), fog sealing shoulders, minor bridge deck repairs, resurfacing bridge decks, traffic management, repairing existing guardrail and other related work. The ramps and will be micromilled and resurfaced with 2.5 inches of Superpave Surface Course.
Location:
  • Town of Millville
  • Town of Uxbridge
  • Construction Begins: Autumn 2018
    Resident Engineer: Scott Fitzgerald
    Construction Bid Price: $4,693,254.20
    District: District 3

    Contracts (1) Progress
    # 103013 -- Construction Contract
    Resurfacing, Pavement Repairs and Related Work (Including 7 Bridges) along a Section of Route 146 Completed

    Bridges

    Contract Dates
    Notice to Proceed: 10/15/2018
    Contract Information
    Project Designer: In-House Boston
    Funding Source: NATIONAL HIGHWAY SYSTEM
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 03/01/2017
    Project Initiation Form PIF Entered 03/01/2017
    Project Initiation Form PRC Submitted 03/02/2017
    Project Review Committee PRC Approved 03/23/2017
    Project Status Advertised 12/16/2017
    Project Management
    100% Design 100% Package Received 11/15/2017
    100% Design 100% Package Comments to DE 11/27/2017
    100% Design 100% Package Comments to DE 11/29/2017
    25% Design 25% Package Received 08/15/2017
    25% Design 25% Package Comments to DE 09/05/2017
    25% Design 25% Package Comments to DE 09/29/2017
    75% Design 75% Package Received 08/15/2017
    75% Design 75% Package Comments to DE 09/05/2017
    75% Design 75% Package Comments to DE 09/29/2017
    Final Design PS&E Received 11/15/2017
    Final Design PS&E to FAPRO 12/05/2017
    Final Design PS&E Received - Resub 1 05/03/2018