Project Description:
HARDWICK- NEW BRAINTREE- BRIDGE REPLACEMENT, H-08-003=N-07-002, CREAMERY ROAD OVER WARE RIVER
This proposed bridge project consists of a 100’ long single span bridge. The bridge will increase the total curb-to-curb width to 14’ and an architecturally styled concrete bridge railing system will be located along both sides of the bridge with a steel highway guard railing located on both sides of both approaches. The roadway will be raised approximately 2’ to provide for hydraulic clearances which will require approximately 200’ of roadway improvements along both sides of the bridge. No pedestrian or bicycle accommodation improvements will be provided.
Location:
  • Town of Hardwick
  • Town of New Braintree
  • Construction Begins: Summer 2024
    Resident Engineer: Richard Wonderlie
    Construction Bid Price: $3,385,314.00
    District: District 2

    Contracts (3) Progress
    # 101632 -- Design -- Bridge Open End
    Work will consist of providing engineering design and review services to MassDOT on an open end basis for various statewide and bridge projects, for the purpose of maintaining Final
    # 115749 -- Design -- Services
    Statewide - Master Service Agreement for design and review services. Final
    # 126586 -- Construction Contract
    Bridge Replacement, H-08-003=N-07-002, Creamery Road over Ware River

    Bridges

    Contract Dates
    Notice to Proceed: 08/30/2024
    Contract Information
    Project Designer: Consultant
    Funding Source: FED. AID. ACCELERATED BRIDGE
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 03/20/2017
    Project Initiation Form PIF Entered 03/20/2017
    Project Initiation Form PRC Submitted 03/20/2017
    Project Review Committee PRC Approved 03/23/2017
    Project Status Advertised 06/29/2024
    Project Management
    100% Design 100% Package Received 09/16/2022
    100% Design 100% Package Comments to DE 11/30/2022
    25% Design 25% Package Received 04/13/2020
    25% Design 25% Package Comments to DE 08/13/2020
    25% Design 25% Package Received - Resub 1 02/17/2021
    25% Design Design Public Hearing 03/04/2021
    75% Design 75% Package Received 12/21/2021
    75% Design 75% Package Comments to DE 03/24/2022
    Final Design PS&E Received 05/23/2023
    Final Design PS&E Received - Resub 1 02/21/2024
    Final Design PS&E Received - Resub 2 05/10/2024
    Consultant Contract Process Scope to DE 01/26/2018
    Consultant Contract Process NTP Issued 04/24/2018