Project Description:
SOUTHBRIDGE- BRIDGE REPLACEMENT, S-21-009, MILL STREET OVER MCKINSTRY BROOK & S-21-003, MILL STREET OVER THE QUINEBAUG RIVER
The work under this contract consists of replacing the superstructure of the bridge carrying Mill Street over the Quinebaug River (S-21-003) and the reconstruction of the bridge carrying Mill Street over McKinstry Brook (S-21-009) and their approaches. The project limits are from the intersections of Mill Street and High Street to Mill Street and River Street. The work on the approaches includes the construction of new cement concrete pedestrian curb ramps, sidewalks, and driveways, hot mix asphalt driveways, granite curb, minor drainage and utility alterations, tree trimming, removal and protection, traffic signal upgrades, pavement markings and signing, and other incidental work.
Location:
  • Town of Southbridge
  • Design Responsibility: Consultant
    Right of Way Responsibility: Municipality
    Construction Begins: Summer 2026
    Project Manager: Alwin Ramirez
    Estimated Total Contract Cost: $12,026,144.06
    Estimated Total Federal Participating Construction Cost: $12,413,482.69
    Funding Provision: This project is planned to be funded through the 2026 Transportation Improvement Program for the Central Massachusetts Metropolitan Planning Organization.
    District: District 3
    Current Status: 75% Package Received (as of 10/04/2024 )

    Contracts (1) Progress
    # 77887 -- Design -- Hwy Eng Open End
    Master Service Agreement for statewide design and review services. Final

    Bridges

    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Accelerated Bridge Program
    no comments
    Planned Federal FY: 2026
    Responsible MPO: Central Massachusetts Metropolitan Planning Organization
    Location: Municipality
    Cities: SOUTHBRIDGE
    Category: Advertised Projects Constr.
    Budget Section: 2A
    Advance Construct: No
    Air Quality Exempt: No

  • Construction, Total Project Cost = $9,214,736, Design Status = 25%, YOE = 4%
  • Category FA - Surface Trans. Block Grant (STBG) - Off System Bridge
    Federal Cost: $7,371,788.80
    State Cost: $1,842,947.20
    Total Cost: $9,214,736.00

    Project Task Information
    Project Status
    Project Need Form PNF Entered 03/22/2017
    Project Initiation Form PIF Entered 03/22/2017
    Project Initiation Form PRC Submitted 03/24/2017
    Project Review Committee PRC Approved 07/20/2017
    Project Management
    25% Design 25% Package Received 03/09/2023
    75% Design 75% Package Received 10/04/2024
    Consultant Contract Process NTP Issued 02/27/2019