Project Description: |
DISTRICT 5- SYSTEMATIC BRIDGE PRESERVATION ALONG THE ROUTE 24 CORRIDOR
|
Location: | |
Construction Begins: | Winter 2021/2022 |
Resident Engineer: | Fedner Pierre |
Construction Bid Price: | $1,369,065.50 |
District: | District 5 |
|
Bridges
|
|
|
|
|