| Project Description: |
DISTRICT 5- SYSTEMATIC BRIDGE PRESERVATION ALONG THE ROUTE 24 CORRIDOR
|
| Location: | |
| Construction Begins: | Winter 2021/2022 |
| Resident Engineer: | Fedner Pierre![]() |
| Construction Bid Price: | $1,369,065.50 |
| District: | District 5 |
|
Bridges
|
||||||||
|
||||||||||
|
|
|
||||||||||||||||||||||||||||||||