| Project Description: |
GARDNER- RESURFACING AND RELATED WORK ON PEARSON BOULEVARD
The proposed improvements include resurfacing from South Main Street to the Route 2 interchange rotary. Bike lanes will be delineated, and sidewalks will be restored on both sides of the road. An improved pedestrian crossing will be developed at the South Main Street intersection. Enhanced traffic signage will be placed throughout.
|
| Location: |
|
| Design Responsibility: | Municipality |
| Right of Way Responsibility: | Municipality |
| Project Manager: | Joshua Bartus![]() |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 3 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges |
||||||
|
|
|
||