Project Description: |
FRAMINGHAM- TRAFFIC SIGNAL INSTALLATION AT EDGELL ROAD AT CENTRAL STREET
The project involves geometric improvements and installation of a traffic signal at the intersection. The project will also improve pedestrian mobility and safety by providing an exclusive pedestrian phase as well as ADA/AAB compliant sidewalks along both sides of all roadways and crosswalks across all approaches.
|
Location: |
|
Construction Begins: | Autumn 2023 |
Resident Engineer: | Adam Cline![]() |
Construction Bid Price: | $2,496,117.31 |
District: | District 3 |
|
Bridges |
|
|
|
|