Project Description: |
SOUTHBRIDGE- QUINEBAUG RIVER BANK STABILIZATION
The proposed project consists of slope stabilization along a 200 foot section of the trail along the Quinebaug River that has significant erosion. Essentially proposing a boulder slope with planting, along with a drainage swale on the western side of the trail to reduce the impacts of stormwater runoff coming from the adjacent buildings.
|
Location: |
|
Construction Begins: | Winter 2019/2020 |
Resident Engineer: | Stephen Shamoian |
Construction Bid Price: | $362,215.00 |
District: | District 3 |
|