SOUTHBRIDGE- QUINEBAUG RIVER BANK STABILIZATION
The proposed project consists of slope stabilization along a 200 foot section of the trail along the Quinebaug River that has significant erosion. Essentially proposing a boulder slope with planting, along with a drainage swale on the western side of the trail to reduce the impacts of stormwater runoff coming from the adjacent buildings.
|
| Location: |
|
| Construction Begins: | Winter 2019/2020 |
| Resident Engineer: | Stephen Shamoian![]() |
| Construction Bid Price: | $362,215.00 |
| District: | District 3 |
|