Project Description:
WESTON- INTERSECTION IMPROVEMENTS BOSTON POST ROAD (ROUTE 20) AT WELLESLEY STREET
The proposed project consists of the installation of a new traffic signal system at intersection of Route 20 at Boston Post Road and Wellesley Street in Weston, MA. The work includes geometric revisions to the intersection to reduce driver confusion; installation of buffered bicycle lanes; sidewalk econstruction; new crosswalks; pavement mill / overlay; drainage modifications; and pavement markings/signage. The proposed project consists of two corridors: Route 20 and Boston Post Road / Wellesley Street. The Route 20 project limits start approximately 500 feet west and ends approximately 550 feet east of the intersection with Boston Post Road and Wellesley Street. For Boston Post Road and Wellesley Street project limits start approximately 300 feet north on Boston Post Road and ends approximately 350 feet south on Wellesley Street of the intersection with Route 20. The proposed project also includes full depth reconstruction for approximately 250 feet of private way called “Winsor Way” located east of Wellesley Street. Additional work includes unclassified excavation, full depth hot mix asphalt pavement, hot mix asphalt sidewalks, hot mix asphalt driveways, granite curb, highway guard, balanced stone wall, fence, landscaping and other incidental work.
Location:
  • Town of Weston
  • Design Responsibility: Municipality
    Construction Begins: Summer 2026
    Project Manager: Alolade O Campbell
    Estimated Total Contract Cost: $3,585,251.00
    Estimated Total Federal Participating Construction Cost: $3,966,586.00
    Funding Provision: This project is planned to be funded through the 2026 Transportation Improvement Program for the Boston Metropolitan Planning Organization.
    District: District 6
    Current Status: 100% Package Received (as of 12/13/2024 )

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

  • - none -
  • See the Milestone Details tab for additional Project information
    Initiation
    no comments
    Scoping
    no comments
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Accelerated Bridge Program
    no comments
    Planned Federal FY: 2026
    Responsible MPO: Boston Metropolitan Planning Organization
    Location: Municipality
    Cities: WESTON
    Category: Advertised Projects Constr.
    Budget Section: 1A
    Advance Construct: No
    Air Quality Exempt: No

  • HSIP funded in full.
  • Category FA - Hwy Safety Improvement Prgm (HSIP)
    Federal Cost: $2,914,023.60
    State Cost: $323,780.40
    Total Cost: $3,237,804.00

    Project Task Information
    Project Status
    Project Need Form PNF Entered 11/17/2017
    Project Need Form PNF Approved 11/14/2017
    Project Initiation Form PIF Entered 11/17/2017
    Project Initiation Form PIF Approved 11/17/2017
    Project Initiation Form PRC Submitted 11/17/2017
    Project Review Committee PRC Approved 12/14/2017
    Project Management
    100% Design 100% Package Received 12/13/2024
    25% Design 25% Package Received 05/26/2020
    25% Design 25% Package Received - Resub 1 05/18/2021
    75% Design 75% Package Received 06/20/2023
    75% Design 75% Package Received - Resub 1 03/26/2024