Project Description: |
CONCORD- LINCOLN- ROUTE 2 CROSBY CORNER WETLAND MITIGATION
Project is in response to deficiencies found in BMPs constructed through Crosby Corner Project. Proposed BMP will intercept existing storm water from state drainage system.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Project Manager: | Gautam Sen |
Estimated Total Contract Cost: | $187,000.00 |
Estimated Total Federal Participating Construction Cost: | $212,500.00 |
District: | District 4 |
Current Status: | This project is in the preliminary design phase. |
|