Project Description:
WESTWOOD- TRAFFIC SIGNAL IMPROVEMENTS ON ROUTE 109
The project area is located along High Street (Route 109) between Hartford Street and Lowder Brook Drive in Westwood. The project proposes to replace/upgrade or add traffic signal equipment components necessary to implement an Intelligent Transportation System (ITS) by operating the corridor traffic signals with Adaptive Signal Control Technology (ASCT). The project proposes to retain all existing roadway, sidewalk and drainage features.
Location:
  • Town of Westwood
  • Design Responsibility: Municipality
    Right of Way Responsibility: Municipality
    Project Manager: Jonathan E Freeman
    Estimated Total Contract Cost: $732,848.00
    Estimated Total Federal Participating Construction Cost: $814,400.00
    District: District 6
    Current Status: 25% Package Comments to DE (as of 09/13/2019 )

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

  • - none -
  • See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 11/20/2017
    Project Need Form PNF Approved 11/16/2017
    Project Initiation Form PIF Entered 11/20/2017
    Project Initiation Form PIF Approved 11/20/2017
    Project Initiation Form PRC Submitted 11/20/2017
    Project Review Committee PRC Approved 12/14/2017
    Project Management
    25% Design 25% Package Received 06/05/2019
    25% Design 25% Package Comments to DE 09/13/2019