Enter a City or Road name to search for a new project:
Advanced Project Search
Project Description:
WESTON- RECONSTRUCTION ON ROUTE 30
This project is proposing a roadway improvement project along the Route 30 corridor within the Town of Weston. The project limits include the entire length of Route 30 from the Natick town line to the intersection at Cutters Bluff Rd (end of Town layout), excluding the newly constructed portion of Route 30 at the intersection of Wellesley Street (MassDOT project 602000). One of the project goals would be to tie into this new intersection. The total project length is approximately 3.7 miles. The proposed work would include a combination of resurfacing and box widening to achieve a standard pavement width to include 11-foot lanes and 5-foot shoulders/bike lanes in each direction. The preferred alternative would also provide one 5-foot sidewalk along the corridor. This sidewalk would directly abut the roadway with vertical granite curb in some locations, and separate from the roadway with a landscaped buffer in other locations. The desired goal is to provide pedestrian accommodations where needed while also maintaining the rural character of this corridor. Drainage improvements include adjustments or new catch basins where the edge of pavement is shifting, but otherwise maintaining the existing drainage system to the greatest extent possible. New signage and striping would be provided throughout the entire project limits. Existing lighting will be maintained or relocated as needed based on relocations of utility poles.
Location:
  • Town of Weston
  • Design Responsibility: Municipality
    Right of Way Responsibility: Municipality
    Construction Begins: Summer 2026
    Project Manager: Stephanie Upson
    Estimated Total Contract Cost: $17,722,540.00
    Estimated Total Federal Participating Construction Cost: $18,518,251.84
    Funding Provision: This project is planned to be funded through the 2026 Transportation Improvement Program for the Boston Metropolitan Planning Organization.
    District: District 6
    Current Status: Design Public Hearing (as of 09/22/2022 )

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

  • - none -
  • See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Accelerated Bridge Program
    no comments
    Planned Federal FY: 2026
    Responsible MPO: Boston Metropolitan Planning Organization
    Location: Municipality
    Cities: WESTON
    Category: Advertised Projects Constr.
    Budget Section: 1A
    Advance Construct: No
    Air Quality Exempt: No

  • Adj. TFPC: $16,420,119 (STBG, TAP)
  • Category FA - Trans. Alternative Prgm (TAP)
    Federal Cost: $4,000,000.00
    State Cost: $1,000,000.00
    Total Cost: $5,000,000.00

    Planned Federal FY: 2026
    Responsible MPO: Boston Metropolitan Planning Organization
    Location: Municipality
    Cities: WESTON
    Category: Advertised Projects Constr.
    Budget Section: 1A
    Advance Construct: No
    Air Quality Exempt: No

  • Adj. TFPC: $16,420,119 (STBG, TAP)
  • Category FA - Surface Trans. Block Grant (STBG)
    Federal Cost: $9,136,095.20
    State Cost: $2,284,023.80
    Total Cost: $11,420,119.00

    Project Task Information
    Project Status
    Project Need Form PNF Entered 11/22/2017
    Project Need Form PNF Approved 11/22/2017
    Project Initiation Form PIF Entered 11/22/2017
    Project Initiation Form PIF Approved 11/22/2017
    Project Initiation Form PRC Submitted 11/22/2017
    Project Review Committee PRC Approved 12/14/2017
    Project Management
    25% Design 25% Package Received 10/19/2020
    25% Design 25% Package Comments to DE 04/20/2021
    25% Design Design Public Hearing 09/22/2022