WESTFORD- REHABILITATION OF BOSTON ROAD
The multi-modal improvements encompass a 1.05-mile section of Boston Road from Main Street (Westford Town Center) to the Interstate 495 (I-495) Southbound Off-Ramp within the Town of Westford. The improvements include redefining the cross-section to include a 5-foot bicycle lane and 11-foot travel lane in each direction through the project limits. The improvements also include the construction of sidewalks with vertical granite curbing along the easterly side of Boston Road from Main Street to the I-495 SB Ramps and along the westerly side of Boston Road from Blakes Hill Road to the I-495 SB Ramps; construction of ADA/AAB compliant wheelchair ramps at corridor intersections; construction of a new traffic signal at the intersection of Boston Road and Main Street; modifying traffic signal timings/phasing/infrastructure at three Boston Road intersections including the I-495 SB Ramps, I-495 NB Ramps, and Route 110; reconstruction of the existing storm drain infrastructure; water line replacement; construction of retaining walls; full depth pavement reclaim throughout the corridor; new pavement markings and signs; and accessible pedestrian signals.
Location:
  • Town of Westford
  • Design Responsibility: Municipality
    Construction Begins: Autumn 2024
    Project Manager: Jonathan E Freeman
    Estimated Total Contract Cost: $16,497,354.00
    Estimated Total Federal Participating Construction Cost: $15,093,593.88
    Funding Provision: This project is planned to be funded through the 2024 Transportation Improvement Program for the Northern Middlesex Metropolitan Planning Organization.
    District: District 3
    Current Status: PS&E Received - Resub 2 (as of 04/12/2024 )

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

  • - none -
  • See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Accelerated Bridge Program
    no comments
    Planned Federal FY: 2024
    Responsible MPO: Northern Middlesex Metropolitan Planning Organization
    Location: Municipality
    Cities: WESTFORD
    Category: Advertised Projects Constr.
    Budget Section: 1A
    Advance Construct: No
    Air Quality Exempt: No

  • Total Cost: $10,279,116; Funding: STBG, CMAQ, TAP; TEC Score: 8.60 out of 18;
  • Category FA - Trans. Alternative Prgm (TAP)
    Federal Cost: $225,527.20
    State Cost: $56,381.80
    Total Cost: $281,909.00

    Planned Federal FY: 2024
    Responsible MPO: Northern Middlesex Metropolitan Planning Organization
    Location: Municipality
    Cities: WESTFORD
    Category: Advertised Projects Constr.
    Budget Section: 1A
    Advance Construct: No
    Air Quality Exempt: No

  • Total Cost: $10,279,116; Funding: STBG, CMAQ, TAP; TEC Score: 8.60 out of 18;
  • Category FA - Congestion Mitigation/Air Quality (CMAQ)
    Federal Cost: $1,380,000.00
    State Cost: $345,000.00
    Total Cost: $1,725,000.00

    Planned Federal FY: 2024
    Responsible MPO: Northern Middlesex Metropolitan Planning Organization
    Location: Municipality
    Cities: WESTFORD
    Category: Advertised Projects Constr.
    Budget Section: 1A
    Advance Construct: No
    Air Quality Exempt: No

  • Total Cost: $10,279,116; Funding: STBG, CMAQ, TAP; TEC Score: 8.60 out of 18;
  • Category FA - Surface Trans. Block Grant (STBG)
    Federal Cost: $6,617,765.60
    State Cost: $1,654,441.40
    Total Cost: $8,272,207.00

    Project Task Information
    Project Status
    Project Need Form PNF Entered 02/02/2018
    Project Need Form PNF Approved 11/15/2017
    Project Initiation Form PIF Entered 02/02/2018
    Project Initiation Form PIF Approved 02/02/2018
    Project Initiation Form PRC Submitted 03/09/2018
    Project Review Committee PRC Approved 03/15/2018
    Project Management
    100% Design 100% Package Received 11/03/2023
    25% Design 25% Package Received 11/07/2019
    25% Design 25% Package Comments to DE 02/06/2020
    25% Design Design Public Hearing 01/04/2021
    75% Design 75% Package Received 11/03/2021
    75% Design 75% Package Comments to DE 02/16/2022
    Final Design PS&E Received 02/28/2024
    Final Design PS&E Received - Resub 1 03/13/2024
    Final Design PS&E Received - Resub 2 04/12/2024