| Project Description: |
PEABODY TO GLOUCESTER- GUIDE AND TRAFFIC SIGN REPLACEMENT ON ROUTE 128
Replacement and upgrading of guide and traffic signs on Route 128 between Lowell Street in Peabody and Route 127 in Gloucester, including applicable signs on intersecting secondary roads.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Stephen Timmins![]() |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 4 |
| Current Status: | This project is in the preliminary design phase. |
|