Enter a City or Road name to search for a new project:
Advanced Project Search
Project Description:
CHICOPEE- INTERSECTION IMPROVEMENTS AT MONTGOMERY STREET, GRANBY ROAD, AND MCKINSTRY AVENUE
The project includes the reconstruction of the intersections of Montgomery Street at Granby Road and McKinstry Avenue, Montgomery Street at Shopping Plaza driveway, and Montgomery Street at the Massachusetts Turnpike Interchange 49 ramps. The intersection of Montgomery Street at Granby Road and McKinstry Avenue is proposed to be separated into two roundabouts: one for Montgomery Street at Granby Road and one for Granby Road and McKinstry Avenue. A third roundabout is proposed at Montgomery Street at the Massachusetts Turnpike Interchange 49 ramps. Improved pedestrian accommodations are proposed with new cement concrete sidewalks, HMA shared-use paths, crosswalks, and ADA compliant pedestrian ramps at each roundabout. The roadway improvements for this project will also include roadway widening, full depth pavement, new vertical granite curbing, new reflectorized thermoplastic pavement markings, regulatory and warning signs, roadside restoration, and vegetation clearing. The project has a total length of approximately 2,704 linear feet (0.521-miles). The project limits are as follows: • Along Montgomery Street from approximately 230-feet South of the Mass Turnpike Interchange 49 ramps to approximately 300-feet North of McKinstry Avenue; and • Along Granby Road from approximately 170-feet West of Bay State Road to approximately 330-feet East of McKinstry Avenue; and • Along McKinstry Ave from approximately 300-feet East of Sherbrooke Street to Granby Road.
Location:
  • City of Chicopee
  • Construction Begins: Summer 2026
    Resident Engineer: Madison Bates
    Construction Bid Price: $10,689,985.00
    District: District 2

    Contracts (1) Progress
    # 134287 -- Construction Contract
    Intersection Improvements at Montgomery Street, Granby Road, and McKinstry Avenue 1% Complete

    Bridges

  • - none -
  • Contract Dates
    Notice to Proceed: 08/04/2026
    Contract Information
    Project Designer: Municipality
    Funding Source: FED. AID. ACCELERATED BRIDGE
    See the Milestone Details tab for additional Project information
    Initiation
    no comments
    Scoping
    no comments
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 03/05/2018
    Project Need Form PNF Approved 02/26/2018
    Project Initiation Form PIF Entered 03/05/2018
    Project Initiation Form PIF Approved 03/05/2018
    Project Initiation Form PRC Submitted 03/05/2018
    Project Review Committee PRC Approved 03/15/2018
    Project Status Advertised 05/02/2026
    Project Management
    100% Design 100% Package Received 06/07/2024
    25% Design 25% Package Received 02/10/2021
    25% Design 25% Package Comments to DE 05/12/2021
    25% Design Design Public Hearing 03/02/2022
    75% Design 75% Package Received 09/08/2023
    Final Design PS&E Received 12/23/2024
    Final Design PS&E Received - Resub 3 12/04/2025
    Final Design PS&E Received - Resub 4 04/14/2026