CHICOPEE- INTERSECTION IMPROVEMENTS AT MONTGOMERY STREET, GRANBY ROAD, AND MCKINSTRY AVENUE
The Project as proposed includes replacing the signalized intersections of Granby Road at McKinstry Avenue and Granby Road at Montgomery Street with a multi-lane peanut-shaped roundabout, and the intersection of Montgomery Street at MassPike Access and UHaul Driveway with a single-lane roundabout. Given the safety concern and high crashes along Montgomery Street, it is proposed to separate the northbound and southbound directions of travel with a raised median, also restricting driveway access between Granby Road and the MassPike Access roadway. The roadways would require complete reconstruction, including new curbing, sidewalks, and signage throughout the project limits. Bicycle accommodations would be separated from vehicular traffic via a 10-foot shared-use path on the outside of the proposed roundabouts.
Location:
  • City of Chicopee
  • Design Responsibility: Municipality
    Right of Way Responsibility: Municipality
    Construction Begins: Spring 2026
    Project Manager: Jonathan E Freeman
    Estimated Total Contract Cost: $12,466,072.15
    Estimated Total Federal Participating Construction Cost: $12,344,628.65
    Funding Provision: This project is planned to be funded through the 2026 Transportation Improvement Program for the Pioneer Valley Metropolitan Planning Organization.
    District: District 2
    Current Status: 100% Package Received (as of 06/07/2024 )

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

  • - none -
  • See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Accelerated Bridge Program
    no comments
    Planned Federal FY: 2026
    Responsible MPO: Pioneer Valley Metropolitan Planning Organization
    Location: Municipality
    Cities: CHICOPEE
    Category: Advertised Projects Constr.
    Budget Section: 1A
    Advance Construct: No
    Air Quality Exempt: No

    No comments for this TIP line
    Category FA - Surface Trans. Block Grant (STBG)
    Federal Cost: $8,546,420.00
    State Cost: $2,136,605.00
    Total Cost: $10,683,025.00

    Project Task Information
    Project Status
    Project Need Form PNF Entered 03/05/2018
    Project Need Form PNF Approved 02/26/2018
    Project Initiation Form PIF Entered 03/05/2018
    Project Initiation Form PIF Approved 03/05/2018
    Project Initiation Form PRC Submitted 03/05/2018
    Project Review Committee PRC Approved 03/15/2018
    Project Management
    100% Design 100% Package Received 06/07/2024
    25% Design 25% Package Received 02/10/2021
    25% Design 25% Package Comments to DE 05/12/2021
    25% Design Design Public Hearing 03/02/2022
    75% Design 75% Package Received 09/08/2023