Project Description:
BARNSTABLE- CONSTRUCTION OF A SHARED USE PATH ALONG BEARSES WAY, FROM ROUTE 28 TO PITCHERS WAY
Construct a new paved bicycle/pedestrian shared-use path along a grassed/wooded area on the west side of Bearse’s Way, from the DPW south drive to Pitcher’s Way, a distance of 3802 feet or .72 miles. The paved width of the path will be 10 feet and 3-foot unpaved stabilized shoulders will be provided on each side with slopes no greater than 6:1 horizontal to vertical. Utilities will be relocated if necessary. Drainage will be improved as necessary/appropriate. Lighting will be installed through wooded areas; open areas are lit by existing street lights. Arborvitae will be planted along the DPW chain link fence for visual screening and a safety buffer. A crosswalk and ADA-compliant sidewalk ramps will be installed across Pitcher’s Way at Bearse’s Way. The shared-use path terminus at Pitcher’s Way will include a splitter channel to prevent vehicle access.
Location:
  • Town of Barnstable
  • Design Responsibility: Municipality
    Right of Way Responsibility: Municipality
    Project Manager: David Shedd
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 5
    Current Status: PS&E Received - Resub 1 (as of 06/27/2023 )

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

  • - none -
  • See the Milestone Details tab for additional Project information
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Status PIF Entered 03/06/2018
    Project Status PNF Entered 03/06/2018
    Project Status PNF Approved 02/16/2018
    Project Status PIF Approved 03/06/2018
    Project Status PRC Approved 03/15/2018
    Project Status PRC Submitted 03/12/2018
    Project Management
    Consultant Contract Process 25% Package Received 07/12/2018
    Consultant Contract Process 75% Package Received 03/17/2021
    Consultant Contract Process 100% Package Received 02/01/2023
    Consultant Contract Process 25% Package Comments to DE 11/08/2018
    Consultant Contract Process 75% Package Comments to DE 07/16/2021
    Consultant Contract Process PS&E Received - Resub 1 06/27/2023
    Consultant Contract Process Design Public Hearing 10/26/2020