| Project Description: |
MONTEREY- BRIDGE REPLACEMENT, M-29-001, CURTIS ROAD OVER KONKAPOT RIVER
The proposed project calls for complete replacement of the Curtis Road bridge over the Konkapot River requiring a full bridge closure and detour. The project limits extend from 300 feet north of the bridge to 300 feet south of the bridge. The cross section will contain two 11-foot travel lanes, one in each direction,with two 2-foot shoulders. There will be no proposed sidewalk.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | Municipality |
| Construction Begins: | Summer 2027 |
| Project Manager: | Jonathan E Freeman![]() |
| Estimated Total Contract Cost: | $4,917,599.01 |
| Estimated Total Federal Participating Construction Cost: | $5,320,027.45 |
| Funding Provision: | This project is planned to be funded through the 2027 Transportation Improvement Program for the Berkshire Metropolitan Planning Organization. |
| District: | District 1 |
| Current Status: | Design Public Hearing (as of 08/07/2025 ) |
|