Project Description: |
DISTRICT 5- DRAWBRIDGE OPERATION, REPAIR & SYSTEMATIC PRESERVATION AT VARIOUS LOCATIONS
|
Location: | |
Construction Begins: | Spring 2019 |
Resident Engineer: | Louis daPonte |
Construction Bid Price: | $3,052,125.00 |
District: | District 5 |
|
Bridges |
|
|
|
|