| Project Description: |
WILLIAMSTOWN- SYSTEMATIC BRIDGE MAINTENANCE, W-37-013, ROUTE 7 (MOODY BRIDGE) OVER HOOSIC RIVER & PAN-AM RR
Through asset management analysis, it has been determined that the bridge is in need of systematic maintenance at this time in its life-cycle to preserve its condition and serviceability.
|
| Location: |
|
| Construction Begins: | Winter 2021/2022 |
| Resident Engineer: | Peter Lamarre![]() |
| Construction Bid Price: | $1,157,693.00 |
| District: | District 1 |
|