Project Description: |
WILLIAMSTOWN- SYSTEMATIC BRIDGE MAINTENANCE, W-37-013, ROUTE 7 (MOODY BRIDGE) OVER HOOSIC RIVER & PAN-AM RR
Through asset management analysis, it has been determined that the bridge is in need of systematic maintenance at this time in its life-cycle to preserve its condition and serviceability.
|
Location: |
|
Project Manager: | Alyson Bedard![]() |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 1 |
Current Status: | This project is in the preliminary design phase. |
|