Project Description: |
WILLIAMSTOWN- SYSTEMATIC BRIDGE MAINTENANCE, W-37-013, ROUTE 7 (MOODY BRIDGE) OVER HOOSIC RIVER & PAN-AM RR
Through asset management analysis, it has been determined that the bridge is in need of systematic maintenance at this time in its life-cycle to preserve its condition and serviceability.
|
Location: |
|
Construction Begins: | Winter 2021/2022 |
Resident Engineer: | Peter Lamarre |
Construction Bid Price: | $1,157,693.00 |
District: | District 1 |
|