| Project Description: |
WILLIAMSTOWN- SYSTEMATIC BRIDGE MAINTENANCE, W-37-013, ROUTE 7 (MOODY BRIDGE) OVER HOOSIC RIVER & PAN-AM RR
Through asset management analysis, it has been determined that the bridge is in need of systematic maintenance at this time in its life-cycle to preserve its condition and serviceability.
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Alyson Bedard![]() |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 1 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
||||||
|
|
|
||