Project Description: |
DUDLEY- BRIDGE REPLACEMENT, D-12-026, STATE ROUTE 131 OVER THE QUINEBAUG RIVER
The scope of work consists of replacing the entire bridge structure, widening the proposed bridge on the westerly side to accommodate a wider sidewalk. The proposed bridge span will increase to meet the 1.2 X bank full width hydraulic criteria. This project will also include performing highway approach work to accommodate the roadway curve alignment to the north and River Road to the south.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Construction Begins: | Winter 2026/2027 |
Project Manager: | William F Brown |
Estimated Total Contract Cost: | $18,910,000.00 |
Estimated Total Federal Participating Construction Cost: | $20,079,060.00 |
Funding Provision: | This project is planned to be funded through the 2026 Transportation Improvement Program for the Central Massachusetts Metropolitan Planning Organization. |
District: | District 3 |
Current Status: | The Notice to Proceed to begin work on the contract has been issued (as of 02/13/2023 ) |
|