Project Description: |
BRIDGEWATER - CONSTRUCTION OF A SALT SHED STORAGE FACILITY AT THE BRIDGEWATER MAINTENANCE DEPOT
|
Location: | |
Design Responsibility: | In-House Boston |
Right of Way Responsibility: | MassDOT |
Project Manager: | Matthew Broderick |
Estimated Total Contract Cost: | $600,000.00 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 5 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges |
|
|
|