Project Description:
PEABODY- INDEPENDENCE GREENWAY EXTENSION
The proposed Independence Greenway Extension is intended to continue the existing Greenway further eastwards from its present eastern terminus at the North Shore Mall to the Warren Street Extension/Endicott Street intersection in central Peabody. This will extend the Greenway by 7000 feet (1.3 miles). The Greenway Extension will mostly be constructed on an abandoned Boston and Maine Railroad right-of-way along Proctor Brook. The only location where there will be an at-grade crossing of a public road is on the North Shore Road, either at its intersection with the North Shore Mall Driveway, or at the former railroad right-of-way across the road. The existing driveway/North Shore Road intersection signal will be adjusted to accommodate bicycle/pedestrian crossings. The proposed path will provide a 10’- 0” wide two-lane two-way bikeway with 2’- 0” wide shoulders on each side. Where the proposed Greenway Extension runs along Proctor Brook, the waterway’s meandering course crosses under the former track centerline at three locations. New concrete box culverts will be installed at two of these locations, while at bridge crossing for the trail will be needed at the easternmost brook crossing near the City powerplant facility. The bridge will be approximately 80 feet long and will carry a 10’- 0” wide two lane two-way bikeway with 1’- 0” wide shoulders on each side. All stream crossings will meet the Massachusetts Stream Crossing Standards to the best extent practicable.
Location:
  • City of Peabody
  • Design Responsibility: Municipality
    Right of Way Responsibility: Municipality
    Construction Begins: Autumn 2024
    Project Manager: Stephanie Upson
    Estimated Total Contract Cost: $7,303,179.02
    Estimated Total Federal Participating Construction Cost: $7,668,984.34
    Funding Provision: This project is planned to be funded through the 2024 Transportation Improvement Program for the Boston Metropolitan Planning Organization.
    District: District 4
    Current Status: PS&E Received (as of 02/12/2024 )

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Accelerated Bridge Program
    no comments
    Planned Federal FY: 2024
    Responsible MPO: Boston Metropolitan Planning Organization
    Location: Municipality
    Cities: PEABODY
    Category: Advertised Projects Constr.
    Budget Section: 1A
    Advance Construct: No
    Air Quality Exempt: No

  • Adj. TFPC: $7,524,204 (CMAQ, TAP)
  • Category FA - Congestion Mitigation/Air Quality (CMAQ)
    Federal Cost: $2,819,363.20
    State Cost: $704,840.80
    Total Cost: $3,524,204.00

    Planned Federal FY: 2024
    Responsible MPO: Boston Metropolitan Planning Organization
    Location: Municipality
    Cities: PEABODY
    Category: Advertised Projects Constr.
    Budget Section: 1A
    Advance Construct: No
    Air Quality Exempt: No

  • Adj. TFPC: $7,524,204 (CMAQ, TAP)
  • Category FA - Trans. Alternative Prgm (TAP)
    Federal Cost: $3,200,000.00
    State Cost: $800,000.00
    Total Cost: $4,000,000.00

    Project Task Information
    Project Status
    Project Need Form PNF Entered 06/19/2018
    Project Need Form PNF Approved 04/12/2018
    Project Initiation Form PIF Entered 06/19/2018
    Project Initiation Form PIF Approved 06/19/2018
    Project Initiation Form PRC Submitted 06/19/2018
    Project Review Committee PRC Approved 07/19/2018
    Project Management
    100% Design 100% Package Received 11/08/2023
    100% Design 100% Package Comments to DE 12/11/2023
    25% Design 25% Package Received 05/03/2021
    25% Design 25% Package Comments to DE 08/18/2021
    25% Design 25% Package Rejected 08/19/2021
    25% Design Design Public Hearing 06/22/2022
    75% Design 75% Package Received 02/03/2023
    75% Design 75% Package Comments to DE 07/28/2023
    Final Design PS&E Received 02/12/2024