Enter a City or Road name to search for a new project:
Advanced Project Search
Project Description:
HARVARD- RESURFACING AND BOX WIDENING ON AYER ROAD, FROM ROUTE 2 TO THE AYER TOWN LINE
The proposed project limits along Ayer Road (Route 110/111) extend approximately 1.7 miles from the driveway to 198-200 Ayer Road (approximately 100 feet south of the State Highway Layout at the Route 2 / Ayer Road interchange) to the Harvard / Ayer Town Line. The project limits along Gebo Lane extend approximately 650-feet from its intersection with Ayer Road to its intersection with Lancaster County Road. The project limits along Lancaster County Road extend approximately 550-feet between Gebo Lane and Ayer Road. The multi-modal improvements are anticipated to include provision of bicycle and pedestrian accommodations, including bicycle lanes in both directions (where feasible), curbing and sidewalk on one side of Ayer Road (where feasible), and ADA/AAB-compliant curb ramps; realignment of Gebo Lane to approximately 90-degrees approaching Ayer Road and incorporation of a roundabout (if feasible) or an improved unsignalized intersection with Gebo Lane under STOP-control; closure of Lancaster County Road to vehicular traffic between Gebo Lane and Ayer Road; upgrade of storm drain infrastructure; pavement resurfacing; and new pavement markings and signs.
Location:
  • Town of Harvard
  • Design Responsibility: Municipality
    Right of Way Responsibility: Municipality
    Construction Begins: Spring 2025
    Project Manager: Muazzez G Reardon
    Estimated Total Contract Cost: $9,551,803.88
    Estimated Total Federal Participating Construction Cost: $11,171,078.63
    Funding Provision: This project is planned to be funded through the 2026 Transportation Improvement Program for the Montachusett Metropolitan Planning Organization.
    District: District 3
    Current Status: 75% Package Comments to DE (as of 04/26/2023 )

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

  • - none -
  • See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Accelerated Bridge Program
    no comments
    Planned Federal FY: 2026
    Responsible MPO: Montachusett Metropolitan Planning Organization
    Location: Municipality
    Cities: HARVARD
    Category: Advertised Projects Constr.
    Budget Section: 1A
    Advance Construct: No
    Air Quality Exempt: No

  • Project is advance constructed between FFY 2026 and FFY 2027. (STBG)
  • Category FA - Surface Trans. Block Grant (STBG)
    Federal Cost: $4,512,297.60
    State Cost: $1,128,074.40
    Total Cost: $5,640,372.00

    Planned Federal FY: 2027
    Responsible MPO: Montachusett Metropolitan Planning Organization
    Location: Municipality
    Cities: HARVARD
    Category: Advertised Projects Constr.
    Budget Section: 1A
    Advance Construct: No
    Air Quality Exempt: No

  • Project is advance constructed between FFY 2026 and FFY 2027. (STBG)
  • Category FA - Surface Trans. Block Grant (STBG)
    Federal Cost: $5,139,514.40
    State Cost: $1,284,878.60
    Total Cost: $6,424,393.00

    Project Task Information
    Project Status
    Project Need Form PNF Entered 06/20/2018
    Project Need Form PNF Approved 06/20/2018
    Project Initiation Form PIF Entered 06/20/2018
    Project Initiation Form PIF Approved 06/20/2018
    Project Initiation Form PRC Submitted 06/26/2018
    Project Review Committee PRC Approved 07/19/2018
    Project Management
    25% Design 25% Package Received 02/22/2021
    25% Design 25% Package Comments to DE 05/25/2021
    25% Design Design Public Hearing 03/30/2022
    75% Design 75% Package Received 02/21/2023
    75% Design 75% Package Comments to DE 04/26/2023