Enter a City or Road name to search for a new project:
Advanced Project Search
Project Description:
LYNN- REHABILITATION OF WESTERN AVENUE (ROUTE 107)
The proposed improvements to the roadway include safety and operational enhancements to the corridor. The limits of the project extend along Western Avenue (Route 107) from Centre Street to Linton Road. The project also includes the three blocks of roadway stretching around the existing Stop & Shop (35 Washington Street) of Washington Street, Franklin Street and Boston Street. In total, the project distance is 2.2 miles and will be rehabilitated by means of mill and overlay. Traffic signals along the corridor will be upgraded to provide an acceptable Level of Service. Complete Streets principles will be incorporated with improved concrete sidewalks, ADA-compliant crosswalks and wheelchair ramps, bicycle lanes and upgraded transit accommodations where feasible. This project is an extension of the PRC-approved Route 107 Corridor Study completed by MassDOT that continues into Salem.
Location:
  • City of Lynn
  • Design Responsibility: Municipality
    Right of Way Responsibility: Municipality
    Construction Begins: Spring 2028
    Project Manager: Jonathan E Freeman
    Estimated Total Contract Cost: $34,695,000.00
    Estimated Total Federal Participating Construction Cost: $40,980,000.00
    Funding Provision: This project is planned to be funded through the 2028 Transportation Improvement Program for the Boston Metropolitan Planning Organization.
    District: District 4
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

  • - none -
  • See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Accelerated Bridge Program
    no comments
    Planned Federal FY: 2028
    Responsible MPO: Boston Metropolitan Planning Organization
    Location: Municipality
    Cities: LYNN
    Category: Advertised Projects Constr.
    Budget Section: 1A
    Advance Construct: No
    Air Quality Exempt: No

  • Construction; STBG+HSIP Total Cost = $45,897,600; AC schedule anticipated over 3 years(2027-2029); Total funding in this TIP =$35,000,000; MPOEvaluation Score = 74.9.
  • Category FA - Hwy Safety Improvement Prgm (HSIP)
    Federal Cost: $4,500,000.00
    State Cost: $500,000.00
    Total Cost: $5,000,000.00

    Planned Federal FY: 2028
    Responsible MPO: Boston Metropolitan Planning Organization
    Location: Municipality
    Cities: LYNN
    Category: Advertised Projects Constr.
    Budget Section: 1A
    Advance Construct: No
    Air Quality Exempt: No

  • Construction; STBG+HSIP Total Cost = $45,897,600; AC schedule anticipated over 3 years(2027-2029); Total funding in this TIP =$35,000,000; MPOEvaluation Score = 74.9.
  • Category FA - Surface Trans. Block Grant (STBG)
    Federal Cost: $8,000,000.00
    State Cost: $2,000,000.00
    Total Cost: $10,000,000.00

    Planned Federal FY: 2029
    Responsible MPO: Boston Metropolitan Planning Organization
    Location: Municipality
    Cities: LYNN
    Category: Advertised Projects Constr.
    Budget Section: 1A
    Advance Construct: No
    Air Quality Exempt: No

  • Construction; STBG+HSIP Total Cost = $45,897,600; AC schedule anticipated over 3 years(2027-2029); Total funding in this TIP =$35,000,000; MPOEvaluation Score = 74.9.
  • Category FA - Hwy Safety Improvement Prgm - Vulnerable User Safety / VUS
    Federal Cost: $1,612,741.50
    State Cost: $179,193.50
    Total Cost: $1,791,935.00

    Planned Federal FY: 2029
    Responsible MPO: Boston Metropolitan Planning Organization
    Location: Municipality
    Cities: LYNN
    Category: Advertised Projects Constr.
    Budget Section: 1A
    Advance Construct: No
    Air Quality Exempt: No

  • Construction; STBG+HSIP Total Cost = $45,897,600; AC schedule anticipated over 3 years(2027-2029); Total funding in this TIP =$35,000,000; MPOEvaluation Score = 74.9.
  • Category FA - Hwy Safety Improvement Prgm (HSIP)
    Federal Cost: $2,887,258.50
    State Cost: $320,806.50
    Total Cost: $3,208,065.00

    Planned Federal FY: 2029
    Responsible MPO: Boston Metropolitan Planning Organization
    Location: Municipality
    Cities: LYNN
    Category: Advertised Projects Constr.
    Budget Section: 1A
    Advance Construct: No
    Air Quality Exempt: No

  • Construction; STBG+HSIP Total Cost = $45,897,600; AC schedule anticipated over 3 years(2027-2029); Total funding in this TIP =$35,000,000; MPOEvaluation Score = 74.9.
  • Category FA - Surface Trans. Block Grant (STBG)
    Federal Cost: $12,000,000.00
    State Cost: $3,000,000.00
    Total Cost: $15,000,000.00

    Project Task Information
    Project Status
    Project Need Form PNF Entered 09/27/2018
    Project Need Form PNF Approved 07/23/2018
    Project Initiation Form PIF Entered 09/27/2018
    Project Initiation Form PIF Approved 09/27/2018
    Project Initiation Form PRC Submitted 10/19/2018
    Project Review Committee PRC Approved 12/06/2018
    Project Management