Enter a City or Road name to search for a new project:
Advanced Project Search
Project Description:
LYNN- REHABILITATION OF WESTERN AVENUE (ROUTE 107)
The proposed project consists of improvements for pedestrians, bicyclists, and vehicle safety and operations along Route 107 (Western Avenue) in Lynn between the Federal Street roundabout and the Linton Road intersection (approximately two (2) miles). Fifteen traffic signals will be installed or upgraded as part of the Project. Besides the locations along the Western Avenue (Route 107) corridor, the signalized location upgrades will include Boston Street at Franklin Street, Boston Street at Washington Street, Chestnut Street at Maple Street, and Waitt Avenue at Eastern Avenue. Separated sidewalk-grade bicycle accommodations will be provided.
Location:
  • City of Lynn
  • Design Responsibility: Municipality
    Right of Way Responsibility: Municipality
    Construction Begins: Spring 2029
    Project Manager: Jonathan E Freeman
    Estimated Total Contract Cost: $33,750,000.00
    Estimated Total Federal Participating Construction Cost: $40,000,000.00
    Funding Provision: This project is planned to be funded through the 2028 Transportation Improvement Program for the Boston Metropolitan Planning Organization.
    District: District 4
    Current Status: Design Public Hearing (as of 11/05/2021 )

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

  • - none -
  • See the Milestone Details tab for additional Project information
    Initiation
    no comments
    Scoping
    no comments
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Accelerated Bridge Program
    no comments
    Planned Federal FY: 2028
    Responsible MPO: Boston Metropolitan Planning Organization
    Location: Municipality
    Cities: LYNN
    Category: Advertised Projects Constr.
    Budget Section: 1A
    Advance Construct: No
    Air Quality Exempt: No

  • Construction; STBG+HSIP Total Cost = $45,897,600; AC schedule anticipated over 3 years(2027-2029); Total funding in this TIP =$35,000,000; MPOEvaluation Score = 74.9.
  • Category FA - Hwy Safety Improvement Prgm (HSIP)
    Federal Cost: $4,500,000.00
    State Cost: $500,000.00
    Total Cost: $5,000,000.00

    Planned Federal FY: 2028
    Responsible MPO: Boston Metropolitan Planning Organization
    Location: Municipality
    Cities: LYNN
    Category: Advertised Projects Constr.
    Budget Section: 1A
    Advance Construct: No
    Air Quality Exempt: No

  • Construction; STBG+HSIP Total Cost = $45,897,600; AC schedule anticipated over 3 years(2027-2029); Total funding in this TIP =$35,000,000; MPOEvaluation Score = 74.9.
  • Category FA - Surface Trans. Block Grant (STBG)
    Federal Cost: $8,000,000.00
    State Cost: $2,000,000.00
    Total Cost: $10,000,000.00

    Planned Federal FY: 2029
    Responsible MPO: Boston Metropolitan Planning Organization
    Location: Municipality
    Cities: LYNN
    Category: Advertised Projects Constr.
    Budget Section: 1A
    Advance Construct: No
    Air Quality Exempt: No

  • Construction; STBG+HSIP Total Cost = $45,897,600; AC schedule anticipated over 3 years(2027-2029); Total funding in this TIP =$35,000,000; MPOEvaluation Score = 74.9.
  • Category FA - Hwy Safety Improvement Prgm - Vulnerable User Safety / VUS
    Federal Cost: $1,612,741.50
    State Cost: $179,193.50
    Total Cost: $1,791,935.00

    Planned Federal FY: 2029
    Responsible MPO: Boston Metropolitan Planning Organization
    Location: Municipality
    Cities: LYNN
    Category: Advertised Projects Constr.
    Budget Section: 1A
    Advance Construct: No
    Air Quality Exempt: No

  • Construction; STBG+HSIP Total Cost = $45,897,600; AC schedule anticipated over 3 years(2027-2029); Total funding in this TIP =$35,000,000; MPOEvaluation Score = 74.9.
  • Category FA - Hwy Safety Improvement Prgm (HSIP)
    Federal Cost: $2,887,258.50
    State Cost: $320,806.50
    Total Cost: $3,208,065.00

    Planned Federal FY: 2029
    Responsible MPO: Boston Metropolitan Planning Organization
    Location: Municipality
    Cities: LYNN
    Category: Advertised Projects Constr.
    Budget Section: 1A
    Advance Construct: No
    Air Quality Exempt: No

  • Construction; STBG+HSIP Total Cost = $45,897,600; AC schedule anticipated over 3 years(2027-2029); Total funding in this TIP =$35,000,000; MPOEvaluation Score = 74.9.
  • Category FA - Surface Trans. Block Grant (STBG)
    Federal Cost: $12,000,000.00
    State Cost: $3,000,000.00
    Total Cost: $15,000,000.00

    Project Task Information
    Project Status
    Project Need Form PNF Entered 09/27/2018
    Project Need Form PNF Approved 07/23/2018
    Project Initiation Form PIF Entered 09/27/2018
    Project Initiation Form PIF Approved 09/27/2018
    Project Initiation Form PRC Submitted 10/19/2018
    Project Review Committee PRC Approved 12/06/2018
    Project Management
    25% Design Design Public Hearing 12/31/2020
    25% Design Design Public Hearing 11/05/2021