Project Description:
EVERETT- CHELSEA- RECONSTRUCTION OF BEACHAM STREET
The proposed improvements include full-depth reconstruction of the 0.65-mile roadway due to the pavement’s state of disrepair. A shared use path with a buffer is proposed along Beacham Street from Robin Street to the Chelsea City Limits to accommodate safe pedestrian and bicycle traffic. The proposed buffer for the shared use path continues through the Behen Street intersection. Minor geometric alignments at Bow Street are proposed to promote safe turning movements for truck traffic. Existing sidewalks will be reconstructed, and vertical granite curbing will be provided along the corridor. The City of Everett’s project will match into the proposed improvements along Beacham Street in Chelsea.
Location:
  • City of Chelsea
  • City of Everett
  • Design Responsibility: Municipality
    Right of Way Responsibility: Municipality
    Construction Begins: Spring 2027
    Project Manager: Lawrence Cash
    Estimated Total Contract Cost: $10,738,523.75
    Estimated Total Federal Participating Construction Cost: $11,610,600.00
    Funding Provision: This project is planned to be funded through the 2025 Transportation Improvement Program for the Boston Metropolitan Planning Organization.
    District: District 4
    Current Status: 25% Package Received (as of 03/26/2024 )

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

  • - none -
  • See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Accelerated Bridge Program
    no comments
    Planned Federal FY: 2025
    Responsible MPO: Boston Metropolitan Planning Organization
    Location: Municipality
    Cities: EVERETT
    Category: Advertised Projects Constr.
    Budget Section: 1A
    Advance Construct: No
    Air Quality Exempt: No

  • Adj. TFPC: $10,548,928 (HSIP, STBG, TAP)
  • Category FA - Hwy Safety Improvement Prgm (HSIP)
    Federal Cost: $900,000.00
    State Cost: $100,000.00
    Total Cost: $1,000,000.00

    Planned Federal FY: 2025
    Responsible MPO: Boston Metropolitan Planning Organization
    Location: Municipality
    Cities: EVERETT
    Category: Advertised Projects Constr.
    Budget Section: 1A
    Advance Construct: No
    Air Quality Exempt: No

  • Adj. TFPC: $10,548,928 (HSIP, STBG, TAP)
  • Category FA - Trans. Alternative Prgm (TAP)
    Federal Cost: $1,520,000.00
    State Cost: $380,000.00
    Total Cost: $1,900,000.00

    Planned Federal FY: 2025
    Responsible MPO: Boston Metropolitan Planning Organization
    Location: Municipality
    Cities: EVERETT
    Category: Advertised Projects Constr.
    Budget Section: 1A
    Advance Construct: No
    Air Quality Exempt: No

  • Adj. TFPC: $10,548,928 (HSIP, STBG, TAP)
  • Category FA - Surface Trans. Block Grant (STBG)
    Federal Cost: $6,119,142.40
    State Cost: $1,529,785.60
    Total Cost: $7,648,928.00

    Project Task Information
    Project Status
    Project Need Form PNF Entered 10/29/2018
    Project Need Form PNF Approved 07/30/2018
    Project Initiation Form PIF Entered 10/29/2018
    Project Initiation Form PIF Approved 10/29/2018
    Project Initiation Form PRC Submitted 10/29/2018
    Project Review Committee PRC Approved 12/06/2018
    Project Management
    25% Design 25% Package Received 03/26/2024