| Project Description: |
DISTRICT 5- TRAFFIC SIGNAL MASTER CONTROL AND CABINET ASSEMBLY INSTALLATION AT VARIOUS LOCATIONS
|
| Location: | |
| Construction Begins: | Spring 2020 |
| Resident Engineer: | David Todesco![]() |
| Construction Bid Price: | $469,928.00 |
| District: | District 5 |
|
Bridges |
||||||||
|
||||||||||
|
|
|
||||||||||||||||||||||||||||||||