DISTRICT 4- SCHEDULED AND EMERGENCY BRIDGE JOINT REPAIRS AT VARIOUS LOCATIONS
The work consists of scheduled and emergency bridge joint and related repairs, including repairs to the sidewalks and approach slabs, under the control of District Four for which no other contracts of this nature have been awarded, and it will include: 1.Installation, repair or replacement of bridge joints. 2.Excavation of deteriorated concrete adjacent to joints. 3.Replacement of the excavated concrete with a fast-setting concrete patching compound. 4.Partial depth and/or full depth excavation of the existing reinforced cement concrete decks where deterioration has occurred. 5.Miscellaneous repairs to various bridge appurtenances. 6.Related traffic management. 7.Furnishing all materials, equipment, labor and traffic control required to perform the necessary repair work. All materials and equipment shall be approved by the Engineer prior to work commencing
Location:
Construction Begins: Summer 2020
Resident Engineer: Desire Manirakiza
Construction Bid Price: $2,482,262.50
District: District 4

Contracts (1) Progress
# 110225 -- Construction Contract
Scheduled and Emergency Bridge Joint Repairs and Related Work at Various Locations Completed

Bridges

  • - none -
  • Contract Dates
    Notice to Proceed: 08/18/2020
    Contract Information
    Project Designer: In-House Boston
    Funding Source: Non Federal Aid
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 11/05/2018
    Project Need Form PNF Approved 11/05/2018
    Project Initiation Form PIF Entered 11/05/2018
    Project Initiation Form PIF Approved 11/05/2018
    Project Initiation Form PRC Submitted 11/27/2018
    Project Review Committee PRC Approved 12/03/2018
    Project Status Advertised 11/23/2019
    Project Management
    Final Design PS&E Received 08/22/2019
    Final Design PS&E Received - Resub 1 09/23/2019
    Final Design PS&E Received - Resub 2 10/25/2019